JNPT's Bharat Mumbai Container Terminal

Port of Singapore Authority

Unik Engineering Services

technovision

Antelec Pvt. Ltd.

Project Title Requirement of Battery charger for Container Port Terminal with compliance to sea shore salty environment with IEC Standards for HT Breaker Panel from ABB Limited.
Execution Process
  • Design & manufacturing of 2 qty of 48 VDC, 60 A Float Cum Boost Battery Chargers.
  • Successfully conducted the installation, testing and commissioning alongside HT Breaker panels supplied by ABB Limited.
Power Projects
User Consultant Contractor
technovision

Indian Potash Limited

ESBEE Consulting Engineers

technovision

ESBEE Power Solutions Pvt Ltd

Project Title Project for the sugar and cogeneration industry having requirement of FC-FCBC with VRLA SMF batteries.
Execution Process
  • Designing & manufacturing of 1 qty of 110 VDC 35 A FC + 40 A FCBC Battery Charger deliver within five weeks.
  • Successfully managed the testing, installation, and commissioning alongside turbines supplied by Siemens.
Power Projects
User Consultant Contractor
technovision

Dabra Alcobrew Private Limited

ESBEE Consulting Engineers

technovision

ESBEE Power Solutions Pvt Ltd.

Project Title Project for the sugar and cogeneration industry having requirement of FC-FCBC with VRLA SMF batteries.
Execution Process
  • Designing & manufacturing of 1 qty of 110 VDC 35 A FC + 40 A FCBC Battery Charger deliver within five weeks.
  • Successfully managed the testing, installation, and commissioning alongside turbines supplied by Triveni.
Power Projects
User Consultant Contractor
technovision

Aditya Birla Group – Grasim Industries

ESBEE Consulting Engineers

technovision

ESBEE Power Solutions Pvt Ltd.

Project Title Project for the sugar and cogeneration industry having requirement of FC-FCBC with VRLA SMF batteries.
Execution Process
  • Designing & manufacturing of 1 qty of 110 VDC 35 A FC + 40 A FCBC Battery Charger deliver within five weeks.
  • Successfully managed the testing, installation, and commissioning alongside turbines supplied by Siemens.
Power Projects
User Consultant Contractor
technovision

Shraddha Energy and Infra Projects Pvt. Ltd.

( Maa Bageshwari Sugar)

ESBEE Consulting Engineers

technovision

ESBEE Power Solutions Pvt Ltd.

Project Title Project for the sugar and cogeneration industry having requirement of FC-FCBC with VRLA SMF batteries.
Execution Process
  • Designing & manufacturing of 1 qty of 110 VDC 75 A FC + 80 A FCBC Battery Charger deliver within five weeks.
  • Successfully managed the testing, installation, and commissioning alongside turbines supplied by Triveni.
Power Projects
User Consultant Contractor
technovision

DMCC Specialty Chemicals Ltd.

ESBEE Consulting Engineers

technovision

Suyash Specialty Engineering

Project Title Project for the chemical Industry having technical requirement of FCBC Charger (Dual Charger).
Execution Process
  • Design & manufacturing of 110 VDC 75 A FC + 80 A FCBC battery charger was deliver within four weeks.
  • Successfully managed the testing, installation, and commissioning alongside turbines supplied by Siemens.